Skip to guide content
Guides
Onboarding / Prepare your locations and fleet4-minute read; allow time for configuration

Set up branches

Guide details
Last reviewed
2026-10-26

Setup outcome

Each location has a saved identity, address, timezone and operating calendar.

Screen: Fleet → Branches → Branch details.

Before you start

Prepare the location’s address, contacts and opening hours. The branch list creates the record; its own detail workspace contains the full configuration.

Setup steps

Step 1

Select or create the branch

Open Branches and search for the location. If it is missing, create it with Name, Slug, Timezone, Phone and Email. Open the saved branch to continue in its detail workspace.

Step 2

Review the branch overview

In Overview, review the branch identity and contacts. For imported branches, check the saved values just as you would for a manually created location.

Step 3

Save the branch address

Use the address search or manual address fields in Overview. Review both address lines, city, region, postal code and country. Check the map location and any missing-coordinates notice, then save the overview changes.

Step 4

Save the branch calendar

In Operating hours, choose the organization timezone or a branch-specific timezone. Keep Inherit organization calendar enabled to use the default, or turn it off and review regular hours, after-hours windows and blackout dates. Select Save operating hours.

Step 5

Review local operating settings

In Settings, review inheritance and any branch-specific operational overrides, including customer delivery. Save that section’s changes. Confirm the saved address, timezone and calendar for every branch. Vehicles and category assignments are prepared in their own fleet tasks; local policy and fee overrides should be reviewed after the organization defaults are set.

Confirm you are ready

Each branch’s overview and applicable local settings are saved. Its calendar intentionally inherits the organization default or has reviewed local hours.

Continue setup

Return to the five-stage setup path for the next task. Mark this task complete only after its saved result has been checked.